top of page

DG

Completed: December 2016

The recent refurbishment of the property, involved a total reconfiguration of the kitchen and living spaces & the relocation of a number of other walls & openings, to minimise circulation space & maximise useable space. Tall ceilings afforded the opportunity to hide all electrical and plumbing services into a new dropped ceiling. Almost all internal surfaces have been replaced with a new material palette of mixed hard-woods, lacquered Steel, metro tiles & Georgian glass. Though the flat is moderately sized at only 64 SqM, the space feels light, airy and relaxed.

bottom of page